Uneven, loose concrete slab floor replaced with suspended timber. Old slabs removed and underlying sand excavated down to required depth. New timber framing installed and floor insulated, with adequate under floor ventilation. Floor finished in 22mm tongue and groove chipboard panels.
Get in touch today...